Public domain
STS-70 payload preparation
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
S95-08961 (4 April 1995) — Workers in the Vertical Processing Facility (VPF) oversee and control the lowering of the Inertial Upper Stage (IUS) booster into a work stand for preflight processing. The IUS will be attached to the Tracking and Data Relay Satellite (TDRS-G), which will be deployed by the Space Shuttle Discovery on the STS-70 mission. The IUS is scheduled to be mated to the TDRS satellite later in April. Liftoff of STS-70 is slated for no earlier than June 8, 1995.
NASA Image and Video Library’s own descriptionCredit lineSTS-70 payload preparation. NASA/JSC, 1995-04-04. Public domain. ID: S95-08961.