Public domain
A-3 Test Stand tops out
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
A construction 'topping out' milestone was reached April 13 with placement of the test cell dome atop NASA's new A-3 Test Stand at Stennis Space Center. NASA broke ground in 2007 for the new stand, which is being built to provide simulated high-altitude testing for next-generation rocket engines that could carry humans into deep space.
NASA Image and Video Library’s own descriptionCredit lineA-3 Test Stand tops out. NASA/SSC, 2011-04-13. Public domain. ID: SSC-20110413-S00495.