Public domain
NASA Stennis Crews Continue Exploration Upper Stage Preparations
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
A pair of umbilical support structures needed for future testing of NASA’s exploration upper stage (EUS) were installed in the B-2 position of the Thad Cochran Test Stand on Oct. 30-31 at NASA’s Stennis Space Center. The support structures arrived from NASA’s Michoud Assembly Facility in New Orleans via the unique NASA Stennis seven-and-a-half-mile canal system in 2023. Since then, crews have prepared the structures that will align with the EUS unit for installation.
NASA Image and Video Library’s own descriptionCredit lineNASA Stennis Crews Continue Exploration Upper Stage Preparations. NASA/SSC, 2024-10-31. Public domain. ID: SSC-20241031-s01127.