Public domain
jsc2024e043919
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
jsc2024e043918 (4/10/2024) ---Binar-2 undergoes deployer fit check testing to ensure all three satellites will be fit for payload integration...Image Credit: Binar Space Program.
NASA Image and Video Library’s own descriptionCredit linejsc2024e043919. NASA/JSC, 2023-08-31. Public domain. ID: jsc2024e043919.