Arkivism
Construction of pile work and a fortified sluice at Muiden, 1673
Public domain

Construction of pile work and a fortified sluice at Muiden, 1673

Cornelis Gerritsz Decker · 1673 · etching; paper

From the collection of Rijksmuseum, Amsterdam. Free to download, adapt and use — no permission needed.

About this work

The construction of a pile work and a fortified sluice at Muiden for flooding against the French, 13 May 1673. Top left a cloth with the Muiderslot, top right the legend A-G.

Rijksmuseum, Amsterdam’s own description
Credit lineBouwen van paalwerk en versterkte sluis bij Muiden, 1673. 1673. Cornelis Gerritsz Decker. Rijksmuseum, Amsterdam. Public domain.

Similar works