Arkivism
KSC-05pd-0539
Public domain

KSC-05pd-0539

NASA / KSC · 2005-04-01 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Kennedy Space Center, Fla. — In the Orbiter Processing Facility bay 1 at NASA’s Kennedy Space Center, workers guide the Hyster fork lift close to Atlantis to install a Space Shuttle Main Engine (SSME) in position number one (upper chamber). Overall, an SSME weighs approximately 7,000 pounds. Three engines provide the thrust, along with the two Solid Rocket Boosters, for liftoff. After about 2 minutes, the two boosters are spent and are separated from the external tank.

NASA Image and Video Library’s own description
Credit lineKSC-05pd-0539. NASA/KSC, 2005-04-01. Public domain. ID: 05pd0539.

Similar works