Arkivism
KSC-05pd-0540
Public domain

KSC-05pd-0540

NASA / KSC · 2005-04-01 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

Kennedy Space Center, Fla. — In the Orbiter Processing Facility bay 1 at NASA’s Kennedy Space Center, workers guide the Hyster fork lift close to Atlantis to install a Space Shuttle Main Engine (SSME) in position number 1 (upper chamber). Overall, an SSME weighs approximately 7,000 pounds. Three engines provide the thrust, along with the two Solid Rocket Boosters, for liftoff. After about 2 minutes, the two boosters are spent and are separated from the external tank.

NASA Image and Video Library’s own description
Credit lineKSC-05pd-0540. NASA/KSC, 2005-04-01. Public domain. ID: 05pd0540.

Similar works