Kennedy Space Center, Fla. — In the Orbiter Processing Facility, Atlantis is ready to be rolled out on its transporter and moved to the Vehicle Assembly Building. In the VAB, the orbiter will be lifted into high bay 3 for mating to the external fuel tank and solid rocket boosters. Atlantis' launch window begins Aug. 28. During its 11-day mission to the International Space Station, the STS-115 crew of six astronauts will install the Port 3/4 truss segment with its two large solar arrays.