Public domain
KSC-07pd0393
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
Kennedy Space Center, Fla. — Pelicans and seagulls witness the slow rollout of Space Shuttle Atlantis to Launch Pad 39A. First motion out of the Vehicle Assembly Building was at 8:19 a.m. The 3.4-mile trip to the pad along the crawlerway will take about 6 hours. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries.
NASA Image and Video Library’s own descriptionSubjects
Credit lineKSC-07pd0393. NASA/KSC, 2007-02-15. Public domain. ID: KSC-07pd0393.