Public domain
KSC-08pd2933
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
CAPE CANAVERAL, Fla. - Using the Hyster forklift, workers move space shuttle main engine No. 3 during installation in space shuttle Discovery in Orbiter Processing Facility bay 3 at NASA's Kennedy Space Center in Florida. Each engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. Discovery is being processed for its next mission, STS-119, targeted for launch on Feb. 12, 2009. Discovery and its crew will deliver integrated truss structure 6 (S6)
NASA Image and Video Library’s own descriptionCredit lineKSC-08pd2933. NASA/KSC, 2008-09-26. Public domain. ID: KSC-08pd2933.