Public domain
KSC-98pc1107
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
At the end of its 6-hour, 4.2-mile circular trek from the Vehicle Assembly Building, the STS-95 Space Shuttle Discovery, still on the Mobile Launch Platform and crawler transporter, sits at Launch Pad 39B. To its left is the Fixed Service Structure that provides access to the orbiter and the Rotating Service Structure. Above it is the 80-foot fiberglass lightning mast that provides protection from lightning strikes.
NASA Image and Video Library’s own descriptionCredit lineKSC-98pc1107. NASA/KSC, 1998-09-21. Public domain. ID: KSC-98pc1107.