Arkivism
KSC-99pp1431
Public domain

KSC-99pp1431

NASA / KSC · 1999-12-16 · photograph (digital archive)

From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.

About this work

After rollback of the Rotating Service Structure at Launch Pad 39B (left) before dawn, the Space Shuttle Discovery is revealed poised for flight on mission STS-103. The rollback of the structure was complete at 4:46 a.m. EST. STS-103 is scheduled for launch Dec. 16 at 9:18 p.m. EST. The mission is expected to last about 9 days and 21 hours with a landing at KSC Sunday, Dec. 26, at 6:56 p.m.

NASA Image and Video Library’s own description
Credit lineKSC-99pp1431. NASA/KSC, 1999-12-16. Public domain. ID: KSC-99pp1431.

Similar works