Public domain
A-2 Test Stand modification work
From the collection of NASA Image and Video Library. Free to download, adapt and use — no permission needed.
About this work
John C. Stennis Space Center employees remove space shuttle main engine run ducts from the A-2 Test Stand engine deck Oct. 25, 2010. Testing of space shuttle main engines concluded in July 2009. Stennis is preparing the A-2 Test Stand for testing the next-generation J-2X rocket engine being developed. Testing of the new engine is scheduled to begin in 2011.
NASA Image and Video Library’s own descriptionCredit lineA-2 Test Stand modification work. NASA/SSC, 2010-10-25. Public domain. ID: SSC-20101025-S02423.